Home / IPW simulation options siemens NX

IPW simulation options siemens NX

What is it?

When you visualize material removal, you can now choose between motion-based IPW updates and length-based IPW.

Why should I use it?

Use motion-based rendering when you want the fastest performance in rendering the resulting IPW. The tool position may be updated several times during a motion, but the IPW is updated only after the motion is complete.

Use length-based rendering when you want to see the material removed in synchronization with the tool motion.

Where do I find it?

Application

Manufacturing

Graphics window

Right-click on an operation→Tool PathSimulate

Location in dialog box

Simulation Settings group →Options

Leave a Reply

Your email address will not be published. Required fields are marked *